Русский Қазақ тілі English
Our phone number: 8 (7182) 61-10-88

Company History

Over the years of its formation the Company has not only mastered manufacturing of the main products – MTBE and polypropylene, which are highly demanded in the market, but also began further processing of raw materials in order to obtain the final product with high added value.

завод2

2021 The Calibration Laboratory successfully passed the accreditation for compliance with GOST ISO/IEC 17025-2019 “General Requirements for the Competence of Testing and Calibration Laboratories”, recertification for compliance of the Quality Management System with ST RK ISO 9001:2016 (ISO 9001:2015) (Kazakhstan ISO standard) and ISO 9001:2015;  IAF International certificate was received.

2019 The Plant Research Laboratory was successfully reaccredited for compliance with the requirements of GOST ISO/IEC 17025-2019 “General Requirements for the Competence of Testing and Calibration Laboratories”.

2015 Kaizen lean management system was implemented.

2014 A new workshop of polypropylene powder pelletizing was launched during a nationwide teleconference bridge called New Industrialization of Kazakhstan: Results of 2014 and the First Five-Year Plan with the participation of Nursultan Nazarbayev, the President of the Republic of Kazakhstan.

2013 The polypropylene bag production workshop No. 1 was launched with the participation of President Nazarbayev. Neftekhim became the winner of the Altyn Sapa national contest and received The Best Production Enterprise Award.

2012 Neftekhim successfully passed an inspection audit for the QMS compliance with the requirements of ST RK ISO 9001:2009, ISO 9001:2008, and received the TQCSI certificate, Australia.

2010 Design capacity was reached ahead of schedule: MTBE – 20 thousand tons/year; polypropylene – 30 thousand tons/year.

2009 The plant began operational with the participation of President Nazarbayev.

2006  The plant construction was started.

2005 Kompaniya Neftekhim LTD  LLP was established